On this project we used posi tracks to move and place buffer sands to a depth of 350mm across a landfill liner cell. The requirement for light machinery meant dozers were not allowed on the liner and the sand had to be stockpiled at the front of the cell meaning a 150mtr run to place each bucket . Over 2000 tonnes of sand was placed in 3 days using the two machines.